mirror of
https://github.com/Donchitos/Claude-Code-Game-Studios.git
synced 2026-06-27 04:51:46 +00:00
Update docs, skill counts, and UX/setup-engine skills for v0.4.0
- Update skill count to 66 and hook count to 12 across README, skills-reference, and badges - Add QA & Testing section to README and skills-reference (qa-plan, smoke-check, soak-test, etc.) - Add Input & Platform section to technical-preferences.md (populated by /setup-engine) - Document post-compact, notify, and validate-skill-change hooks in hooks-reference - Expand /setup-engine, /ux-design, /ux-review, /design-system skills with input/platform context - Restructure workflow-catalog: move UX steps into pre-production phase, improve descriptions - Expand UPGRADING.md and WORKFLOW-GUIDE.md with v0.4.0 guidance - Add skill-flow-diagrams examples and CODEOWNERS Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -37,8 +37,15 @@ PHASE 3: TECHNICAL SETUP
|
||||
│
|
||||
▼
|
||||
PHASE 4: PRE-PRODUCTION
|
||||
[UX — before epics, so specs exist when stories are written]
|
||||
/ux-design [screen/hud/patterns] ────────────────────────────► design/ux/*.md
|
||||
/ux-review ──────────────────────────────────────────────────► UX specs approved
|
||||
/ux-review ──────────────────────────────────────────────────► UX specs approved (HARD gate for /team-ui)
|
||||
|
||||
[Test infrastructure — scaffold before stories reference tests]
|
||||
/test-setup ─────────────────────────────────────────────────► test framework + CI/CD pipeline
|
||||
/test-helpers ───────────────────────────────────────────────► tests/helpers/[engine-specific].gd
|
||||
|
||||
[Stories + prototype]
|
||||
/create-epics [layer] ───────────────────────────────────────► production/epics/*/EPIC.md
|
||||
/create-stories [epic-slug] ─────────────────────────────────► production/epics/*/story-*.md
|
||||
/prototype [core-mechanic] ──────────────────────────────────► prototypes/[name]/
|
||||
@@ -51,7 +58,27 @@ PHASE 5: PRODUCTION (repeating sprint loop)
|
||||
/sprint-status ──────────────────────────────────────────────► sprint snapshot
|
||||
/story-readiness [story] ────────────────────────────────────► story validated READY
|
||||
│
|
||||
▼ implement (gameplay-programmer, etc.)
|
||||
▼ (pick up and implement)
|
||||
/dev-story [story] ──────────────────────────────────────────► routes to correct programmer agent
|
||||
│
|
||||
▼ (during implementation, as needed)
|
||||
/code-review ────────────────────────────────────────────────► code review report
|
||||
/scope-check ────────────────────────────────────────────────► scope creep detected / clear
|
||||
/content-audit ──────────────────────────────────────────────► GDD content gaps identified
|
||||
/bug-report ─────────────────────────────────────────────────► production/qa/bugs/bug-NNN.md
|
||||
/bug-triage ─────────────────────────────────────────────────► bugs re-prioritized + assigned
|
||||
|
||||
[Team skills for feature areas — spawn when working a full feature]
|
||||
/team-combat / /team-narrative / /team-ui / /team-level / /team-audio
|
||||
|
||||
[QA cycle per sprint]
|
||||
/qa-plan ────────────────────────────────────────────────────► production/qa/qa-plan-sprint-NN.md
|
||||
/smoke-check ────────────────────────────────────────────────► smoke test gate (PASS/FAIL)
|
||||
/regression-suite ───────────────────────────────────────────► coverage gaps + missing regression tests
|
||||
/test-evidence-review ───────────────────────────────────────► evidence quality report
|
||||
/test-flakiness ─────────────────────────────────────────────► flaky test report
|
||||
│
|
||||
▼
|
||||
/story-done [story] ─────────────────────────────────────────► story closed + next surfaced
|
||||
/sprint-plan [next] ─────────────────────────────────────────► next sprint
|
||||
│
|
||||
@@ -63,8 +90,12 @@ PHASE 5: PRODUCTION (repeating sprint loop)
|
||||
PHASE 6: POLISH
|
||||
/perf-profile ───────────────────────────────────────────────► perf report + fixes
|
||||
/balance-check ──────────────────────────────────────────────► balance report + fixes
|
||||
/asset-audit ────────────────────────────────────────────────► asset compliance report
|
||||
/tech-debt ──────────────────────────────────────────────────► docs/tech-debt-register.md
|
||||
/soak-test ──────────────────────────────────────────────────► soak test protocol + results
|
||||
/localize ───────────────────────────────────────────────────► localization readiness report
|
||||
/team-polish ────────────────────────────────────────────────► polish sprint orchestrated
|
||||
/team-qa ────────────────────────────────────────────────────► full QA cycle sign-off
|
||||
/gate-check ─────────────────────────────────────────────────► PASS → advance to release
|
||||
│
|
||||
▼
|
||||
@@ -74,6 +105,10 @@ PHASE 7: RELEASE
|
||||
/changelog ──────────────────────────────────────────────────► CHANGELOG.md
|
||||
/patch-notes ────────────────────────────────────────────────► player-facing notes
|
||||
/team-release ───────────────────────────────────────────────► release pipeline orchestrated
|
||||
│
|
||||
▼ (post-launch, ongoing)
|
||||
/hotfix ─────────────────────────────────────────────────────► emergency fix with audit trail
|
||||
/team-live-ops ──────────────────────────────────────────────► live-ops content plan
|
||||
```
|
||||
|
||||
---
|
||||
@@ -113,12 +148,82 @@ upstream GDDs (input, if any)
|
||||
|
||||
---
|
||||
|
||||
## Skill Chain: Story Lifecycle in Detail
|
||||
## Skill Chain: UX / UI Pipeline in Detail
|
||||
|
||||
How a story gets from backlog to closed:
|
||||
UX specs are authored in Phase 4 (Pre-Production), before epics are written, so
|
||||
that story acceptance criteria can reference specific UX artifacts.
|
||||
|
||||
```
|
||||
/create-epics [layer: foundation]
|
||||
design/gdd/*.md (UI/UX requirements extracted)
|
||||
design/player-journey.md (emotional arc, if authored)
|
||||
│
|
||||
▼
|
||||
/ux-design hud → design/ux/hud.md
|
||||
/ux-design screen [name] → design/ux/screens/[name].md
|
||||
/ux-design patterns → design/ux/interaction-patterns.md
|
||||
│
|
||||
▼
|
||||
/ux-review design/ux/
|
||||
│
|
||||
├── APPROVED → UX specs ready, proceed to /create-epics
|
||||
├── NEEDS REVISION → blocking issues listed → fix → re-run review
|
||||
└── MAJOR REVISION → fundamental UX problems → redesign before epics
|
||||
│
|
||||
▼ (after APPROVED — in Phase 5 when implementing UI features)
|
||||
/team-ui
|
||||
│
|
||||
├── Phase 1: /ux-design (if any specs still missing) + /ux-review
|
||||
├── Phase 2: visual design (art-director)
|
||||
├── Phase 3: layout implementation (ui-programmer)
|
||||
├── Phase 4: accessibility audit (accessibility-specialist)
|
||||
└── Phase 5: final review
|
||||
|
||||
Note: /ux-design and /ux-review belong in Phase 4 (Pre-Production).
|
||||
/team-ui belongs in Phase 5 (Production) when a UI feature is being built.
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## Skill Chain: Dev Story Flow in Detail
|
||||
|
||||
How a story moves from backlog to closed:
|
||||
|
||||
```
|
||||
/story-readiness [story]
|
||||
│
|
||||
├── READY → Status: ready-for-dev → pick up for implementation
|
||||
├── NEEDS WORK → agent shows specific gaps → resolve → re-run readiness
|
||||
└── BLOCKED → ADR still Proposed, or upstream story incomplete
|
||||
│
|
||||
▼ (after READY)
|
||||
/dev-story [story]
|
||||
│
|
||||
├── Reads: story file, linked GDD requirement, ADR decisions, control manifest
|
||||
├── Routes to: gameplay-programmer / engine-programmer / ui-programmer / etc.
|
||||
│
|
||||
└── Implementation begins
|
||||
│
|
||||
▼ (optional, during/after implementation)
|
||||
/code-review → architectural review of changeset
|
||||
/scope-check → verify no scope creep vs. original story criteria
|
||||
/test-evidence-review → validate test files and manual evidence quality
|
||||
│
|
||||
▼
|
||||
/story-done [story]
|
||||
│
|
||||
├── COMPLETE → Status: Complete, sprint-status.yaml updated, next story surfaced
|
||||
├── COMPLETE WITH NOTES → complete but some criteria deferred (logged)
|
||||
└── BLOCKED → acceptance criteria cannot be verified → investigate blocker
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## Skill Chain: Story Lifecycle (Backlog to Closed)
|
||||
|
||||
How a story gets from backlog to closed (summary view):
|
||||
|
||||
```
|
||||
/create-epics [layer]
|
||||
│
|
||||
└── Output: production/epics/[slug]/EPIC.md
|
||||
│
|
||||
@@ -131,24 +236,68 @@ How a story gets from backlog to closed:
|
||||
▼
|
||||
/story-readiness [story]
|
||||
│
|
||||
├── READY → Status: ready-for-dev → pick up for implementation
|
||||
├── NEEDS WORK → agent shows specific gaps → resolve → re-run readiness
|
||||
└── BLOCKED → ADR still Proposed, or upstream story incomplete
|
||||
│
|
||||
▼ (after READY)
|
||||
Implementation (gameplay-programmer, etc.)
|
||||
│
|
||||
▼
|
||||
/story-done [story]
|
||||
│
|
||||
├── COMPLETE → Status: Complete, sprint-status.yaml updated, next story surfaced
|
||||
├── COMPLETE WITH NOTES → complete but some criteria deferred (logged)
|
||||
└── BLOCKED → acceptance criteria cannot be verified → investigate blocker
|
||||
├── READY → /dev-story → implement → /story-done
|
||||
├── NEEDS WORK → resolve gaps → re-run
|
||||
└── BLOCKED → fix upstream dependency first
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## Skill Chain: UX Pipeline in Detail
|
||||
## Skill Chain: QA Pipeline in Detail
|
||||
|
||||
```
|
||||
[Phase 4 — one-time infrastructure setup]
|
||||
/test-setup ────────────────────────────────────────────────────► test framework scaffolded + CI/CD wired
|
||||
/test-helpers ──────────────────────────────────────────────────► tests/helpers/[engine].gd (GDUnit4, NUnit, etc.)
|
||||
|
||||
[Phase 5 — per-sprint QA cycle]
|
||||
/qa-plan [sprint or feature]
|
||||
│
|
||||
├── Reads: story files, GDDs, acceptance criteria
|
||||
├── Classifies each story by test type:
|
||||
│ Logic → automated unit test (BLOCKING)
|
||||
│ Integration → integration test or documented playtest (BLOCKING)
|
||||
│ Visual/Feel → screenshot + lead sign-off (ADVISORY)
|
||||
│ UI → manual walkthrough or interaction test (ADVISORY)
|
||||
│ Config/Data → smoke check (ADVISORY)
|
||||
└── Output: production/qa/qa-plan-sprint-NN.md
|
||||
│
|
||||
▼
|
||||
/smoke-check
|
||||
│
|
||||
├── PASS → QA hand-off cleared
|
||||
└── FAIL → block sprint close → fix critical paths first
|
||||
│
|
||||
▼
|
||||
/regression-suite
|
||||
│
|
||||
└── Coverage gaps + list of fixed bugs without regression tests
|
||||
│
|
||||
▼
|
||||
/test-evidence-review
|
||||
│
|
||||
└── Validates evidence quality, not just existence
|
||||
│
|
||||
▼ (if CI run history available)
|
||||
/test-flakiness
|
||||
│
|
||||
└── Flaky test report + fix recommendations
|
||||
|
||||
[Phase 6 — extended stability testing]
|
||||
/soak-test ─────────────────────────────────────────────────────► soak test protocol + observed results
|
||||
/team-qa ───────────────────────────────────────────────────────► full QA cycle sign-off for release gate
|
||||
|
||||
[Ongoing — bug management]
|
||||
/bug-report ────────────────────────────────────────────────────► production/qa/bugs/bug-NNN.md
|
||||
/bug-triage ────────────────────────────────────────────────────► open bugs re-prioritized + assigned
|
||||
|
||||
[Meta — harness validation]
|
||||
/skill-test [lint|spec|catalog] ────────────────────────────────► skill file structural + behavioral check
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## Skill Chain: UX Pipeline in Detail (Legacy Reference)
|
||||
|
||||
```
|
||||
design/gdd/*.md (UX requirements extracted)
|
||||
@@ -227,7 +376,12 @@ For projects with existing work (use `/start` option D or run directly):
|
||||
| Mid-systems design | `/design-system [next system]` or `/map-systems next` |
|
||||
| All GDDs done | `/review-all-gdds` → `/gate-check` |
|
||||
| In technical setup | `/create-architecture` → `/architecture-decision` |
|
||||
| Have stories, ready to code | `/story-readiness [story]` |
|
||||
| Starting UX design | `/ux-design screen [name]` or `/ux-design hud` |
|
||||
| Scaffolding tests | `/test-setup` → `/test-helpers` |
|
||||
| Have stories, ready to code | `/story-readiness [story]` → `/dev-story [story]` |
|
||||
| Story done | `/story-done [story]` |
|
||||
| Running QA for a sprint | `/qa-plan` → `/smoke-check` → `/regression-suite` |
|
||||
| Bug backlog needs sorting | `/bug-triage` |
|
||||
| Extended stability testing | `/soak-test` |
|
||||
| Not sure | `/help` |
|
||||
| Existing project | `/adopt` |
|
||||
|
||||
Reference in New Issue
Block a user