mirror of
https://github.com/Donchitos/Claude-Code-Game-Studios.git
synced 2026-06-27 04:51:46 +00:00
Game Studio Agent Architecture — complete setup (Phases 1-7)
48 coordinated Claude Code subagents for indie game development: - 3 leadership agents (creative-director, technical-director, producer) - 10 department leads (game-designer, lead-programmer, art-director, etc.) - 23 specialist agents (gameplay, engine, AI, networking, UI, tools, etc.) - 12 engine-specific agents (Godot, Unity, Unreal with sub-specialists) Infrastructure: - 34 skills (slash commands) for workflows, reviews, and team orchestration - 8 hooks for commit validation, asset checks, session management - 11 path-scoped rules enforcing domain-specific standards - 28 templates for design docs, reports, and collaborative protocols Key features: - User-driven collaboration protocol (Question → Options → Decision → Draft → Approval) - Engine version awareness with knowledge-gap detection (Godot 4.6 pinned) - Phase gate system for development milestone validation - CLAUDE.md kept under 80 lines with extracted doc imports Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
58
.claude/docs/templates/risk-register-entry.md
vendored
Normal file
58
.claude/docs/templates/risk-register-entry.md
vendored
Normal file
@@ -0,0 +1,58 @@
|
||||
# Risk: [Short Title]
|
||||
|
||||
## Identification
|
||||
|
||||
- **ID**: RISK-[NNNN]
|
||||
- **Identified By**: [Agent or person]
|
||||
- **Date Identified**: [Date]
|
||||
- **Category**: [Technical | Design | Schedule | Resource | External | Quality]
|
||||
|
||||
## Assessment
|
||||
|
||||
- **Probability**: [Very Low | Low | Medium | High | Very High]
|
||||
- **Impact**: [Minimal | Minor | Moderate | Major | Critical]
|
||||
- **Risk Score**: [Probability x Impact = Low / Medium / High / Critical]
|
||||
|
||||
## Description
|
||||
|
||||
[Detailed description of the risk. What could go wrong? Under what conditions?]
|
||||
|
||||
## Trigger Conditions
|
||||
|
||||
[What observable conditions would indicate this risk is materializing?]
|
||||
|
||||
- [Condition 1]
|
||||
- [Condition 2]
|
||||
|
||||
## Impact Analysis
|
||||
|
||||
### If This Risk Materializes
|
||||
|
||||
- **Schedule Impact**: [How many days/weeks of delay]
|
||||
- **Quality Impact**: [What quality degradation]
|
||||
- **Scope Impact**: [What features affected]
|
||||
- **Cost Impact**: [Resource cost of dealing with it]
|
||||
|
||||
### Affected Systems/Features
|
||||
|
||||
- [System 1]
|
||||
- [System 2]
|
||||
|
||||
## Mitigation Strategy
|
||||
|
||||
### Prevention (reduce probability)
|
||||
|
||||
- [Action to prevent this risk from occurring]
|
||||
- [Owner and deadline for prevention action]
|
||||
|
||||
### Contingency (reduce impact if it occurs)
|
||||
|
||||
- [Action to take if this risk materializes]
|
||||
- [Owner responsible for contingency execution]
|
||||
|
||||
## Current Status
|
||||
|
||||
- **Status**: [Open | Mitigating | Occurred | Closed]
|
||||
- **Last Reviewed**: [Date]
|
||||
- **Trend**: [Increasing | Stable | Decreasing]
|
||||
- **Notes**: [Any updates]
|
||||
Reference in New Issue
Block a user