Release 1.1.3 — long skills keep their later steps

Fix release for 1.1.2: the 14 longest skills keep their later phases
after a compaction, a question nobody answered is never taken as an
answer, settings read the same from a subfolder, the commit check works
for a project in a subfolder of a larger repository, every skill opens
with a title, and the shipped allow rules no longer approve deleting a
branch or writing files without asking. Details in CHANGELOG.md; upgrade
steps in UPGRADING.md (v1.1.2 → v1.1.3).

Refs #83
Refs #133

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_0185en4t76fPn7315q4c3nko
This commit is contained in:
Donchitos
2026-10-08 17:52:48 +11:00
co-authored by Claude Opus 5.5
parent b21fa0f7f2
commit be8993bbc5
231 changed files with 12000 additions and 10527 deletions
+4 -4
View File
@@ -102,8 +102,8 @@ Assign a canonical verdict based on net scope change:
| Net Change | Verdict | Meaning |
|-----------|---------|---------|
| ≤10% | **PASS** | On Track — within acceptable variance |
| 10–25% | **CONCERNS** | Minor Creep — manageable with targeted cuts |
| 25–50% | **FAIL** | Significant Creep — must cut or formally extend timeline |
| >10–25% | **CONCERNS** | Minor Creep — manageable with targeted cuts |
| >25–50% | **FAIL** | Significant Creep — must cut or formally extend timeline |
| >50% | **FAIL** | Out of Control — stop, re-plan, escalate to producer |
**Before applying that table, check that the percentage means something.** Emit
@@ -144,8 +144,8 @@ After presenting the report, offer concrete follow-up:
the baseline document, or point the skill at where the work actually lives).
Do not offer a re-run against the same inputs — it will produce the same
non-answer.
- **CONCERNS** → offer to identify the 2–3 additions with best cut ratio. Reference `/sprint-plan update` to formally re-scope.
- **FAIL** → recommend escalating to producer. Reference `/sprint-plan update` for re-planning or `/estimate` to re-baseline timeline.
- **CONCERNS** → offer to identify the 2–3 additions with best cut ratio. Reference `/sprint-plan update` to formally re-scope (if the project has no sprint plan, as on the default minimal workflow, re-scope by editing the brief's build order).
- **FAIL** → recommend escalating to producer. Reference `/sprint-plan update` for re-planning (if the project has no sprint plan, as on the default minimal workflow, edit the brief's build order) or `/estimate` to re-baseline timeline.
End every verdict except NOT ASSESSED with:
> "Run `/scope-check [name]` again after cuts are made to verify the verdict improves."