> Gate definition, loaded by `/gate-check` for the TARGET PHASE ONLY. > Never load the other five — one gate applies per invocation. # Gate: Systems Design → Technical Setup **Required Artifacts:** - [ ] Systems index exists at `design/gdd/systems-index.md` with at least MVP systems enumerated - [ ] All MVP-tier GDDs exist in `design/gdd/` and individually pass `/design-review` - [ ] A cross-GDD review report exists in `design/gdd/` (from `/review-all-gdds`) **Quality Checks:** - [ ] All MVP GDDs pass individual design review (8 required sections, no MAJOR REVISION NEEDED verdict) - [ ] `/review-all-gdds` verdict is not FAIL (cross-GDD consistency and design theory checks pass) - [ ] All cross-GDD consistency issues flagged by `/review-all-gdds` are resolved or explicitly accepted - [ ] System dependencies are mapped in the systems index and are bidirectionally consistent - [ ] MVP priority tier is defined - [ ] No stale GDD references flagged (older GDDs updated to reflect decisions made in later GDDs) ## Workflow tier reductions The checklist above is the **`full` baseline**. At lower tiers apply the reduction for the resolved tier; items not named keep their status above. Reductions only ever *relax* a requirement — `workflow_overrides` is the only thing that adds one. - **`full`** — systems-index + all MVP GDDs at 8 sections + cross-GDD review report all required - **`standard`** — MVP GDDs validated at the **5 standard sections** (+ conditional Formulas); cross-GDD review report → recommended - **`minimal`** — **gate not applicable** — no gate between brief and code; auto-PASS with a note (see below) > **`minimal` "not applicable" gate.** The Systems Design → Technical Setup gate > has no meaning at `minimal` (no GDDs exist by design). Return a PASS verdict > with the note: *"No design gate at minimal workflow — minimal skips the > Systems Design phase; advancing brief → code."* The Section 6 stage write still > applies on user confirmation. Do NOT flag absent GDDs as blockers.