Files
Claude-Code-Game-Studios/.claude/skills/retrospective/SKILL.md
Donchitos 6c041ac1be Release v0.4.0: /consistency-check, skill fixes, genre-agnostic agents
New skill: /consistency-check — cross-GDD entity registry scanner
New registries: design/registry/entities.yaml, docs/registry/architecture.yaml
Skill fixes: no-arg guards, verdict keywords, AskUserQuestion gates on all team-* skills
Agent fixes: genre-agnostic language in game-designer, systems-designer, economy-designer, live-ops-designer
Docs: skill/template counts corrected, stale references cleaned up

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-27 20:07:44 +11:00

5.9 KiB

name, description, argument-hint, user-invocable, allowed-tools, context
name description argument-hint user-invocable allowed-tools context
retrospective Generates a sprint or milestone retrospective by analyzing completed work, velocity, blockers, and patterns. Produces actionable insights for the next iteration. [sprint-N|milestone-name] true Read, Glob, Grep, Write !git log --oneline --since="2 weeks ago" 2>/dev/null

Phase 1: Parse Arguments

Determine whether this is a sprint retrospective (sprint-N) or a milestone retrospective (milestone-name).


Phase 2: Load Sprint or Milestone Data

Read the sprint or milestone plan from the appropriate location:

  • Sprint plans: production/sprints/
  • Milestone definitions: production/milestones/

Extract: planned tasks, estimated effort, owners, and goals.

Read the git log for the period covered by the sprint or milestone to understand what was actually committed and when.


Scan for completed and incomplete tasks by comparing the plan against actual deliverables. Check for:

  • Tasks completed as planned
  • Tasks completed but modified from the plan
  • Tasks carried over (not completed)
  • Tasks added mid-sprint (unplanned work)
  • Tasks removed or descoped

Scan the codebase for TODO/FIXME trends:

  • Count current TODO/FIXME/HACK comments
  • Compare to previous sprint counts if available (check previous retrospectives)
  • Note whether technical debt is growing or shrinking

Read previous retrospectives (if any) from production/sprints/ or production/milestones/ to check:

  • Were previous action items addressed?
  • Are the same problems recurring?
  • How has velocity trended?

Phase 4: Generate the Retrospective

## Retrospective: [Sprint N / Milestone Name]
Period: [Start Date] -- [End Date]
Generated: [Date]

### Metrics

| Metric | Planned | Actual | Delta |
|--------|---------|--------|-------|
| Tasks | [X] | [Y] | [+/- Z] |
| Completion Rate | -- | [Z%] | -- |
| Story Points / Effort Days | [X] | [Y] | [+/- Z] |
| Bugs Found | -- | [N] | -- |
| Bugs Fixed | -- | [N] | -- |
| Unplanned Tasks Added | -- | [N] | -- |
| Commits | -- | [N] | -- |

### Velocity Trend

| Sprint | Planned | Completed | Rate |
|--------|---------|-----------|------|
| [N-2] | [X] | [Y] | [Z%] |
| [N-1] | [X] | [Y] | [Z%] |
| [N] (current) | [X] | [Y] | [Z%] |

**Trend**: [Increasing / Stable / Decreasing]
[One sentence explaining the trend]

### What Went Well
- [Observation backed by specific data or examples]
- [Another positive observation]
- [Recognize specific contributions or decisions that paid off]

### What Went Poorly
- [Specific issue with measurable impact -- e.g., "Feature X took 5 days
  instead of estimated 2, blocking tasks Y and Z"]
- [Another issue with impact]
- [Do not assign blame -- focus on systemic causes]

### Blockers Encountered

| Blocker | Duration | Resolution | Prevention |
|---------|----------|------------|------------|
| [What blocked progress] | [How long] | [How it was resolved] | [How to prevent recurrence] |

### Estimation Accuracy

| Task | Estimated | Actual | Variance | Likely Cause |
|------|-----------|--------|----------|--------------|
| [Most overestimated task] | [X] | [Y] | [+Z] | [Why] |
| [Most underestimated task] | [X] | [Y] | [-Z] | [Why] |

**Overall estimation accuracy**: [X%] of tasks within +/- 20% of estimate

[Analysis: Are we consistently over- or under-estimating? For which types of
tasks? What adjustment should we apply?]

### Carryover Analysis

| Task | Original Sprint | Times Carried | Reason | Action |
|------|----------------|---------------|--------|--------|
| [Task that was not completed] | [Sprint N-X] | [N] | [Why] | [Complete / Descope / Redesign] |

### Technical Debt Status
- Current TODO count: [N] (previous: [N])
- Current FIXME count: [N] (previous: [N])
- Current HACK count: [N] (previous: [N])
- Trend: [Growing / Stable / Shrinking]
- [Note any areas of concern]

### Previous Action Items Follow-Up

| Action Item (from Sprint N-1) | Status | Notes |
|-------------------------------|--------|-------|
| [Previous action] | [Done / In Progress / Not Started] | [Context] |

### Action Items for Next Iteration

| # | Action | Owner | Priority | Deadline |
|---|--------|-------|----------|----------|
| 1 | [Specific, measurable action] | [Who] | [High/Med/Low] | [When] |
| 2 | [Another action] | [Who] | [Priority] | [When] |

### Process Improvements
- [Specific change to how we work, with expected benefit]
- [Another improvement -- keep it to 2-3 actionable items, not a wish list]

### Summary
[2-3 sentence overall assessment: Was this a good sprint/milestone? What is
the single most important thing to change going forward?]

Phase 5: Save Retrospective

Present the retrospective and top findings to the user (completion rate, velocity trend, top blocker, most important action item).

Ask: "May I write this to production/sprints/sprint-[N]-retrospective.md?" (or the milestone path if applicable)

If yes, write the file, creating the directory if needed. Verdict: COMPLETE — retrospective saved.

If no, stop here. Verdict: BLOCKED — user declined write.


Phase 6: Next Steps

  • Run /sprint-plan to incorporate the action items and velocity data into the next sprint.
  • If this was a milestone retrospective, run /gate-check to formally assess readiness for the next phase.

Guidelines

  • Be honest and specific. Vague retrospectives ("communication could be better") produce vague improvements. Use data and examples.
  • Focus on systemic issues, not individual blame.
  • Limit action items to 3-5. More than that dilutes focus.
  • Every action item must have an owner and a deadline.
  • Check whether previous action items were completed. Recurring unaddressed items are a process smell.
  • If this is a milestone retrospective, also evaluate whether the milestone goals were achieved and what that means for the overall project timeline.