Files
Claude-Code-Game-Studios/.claude/docs/templates/milestone-definition.md
T
DonchitosandClaude Opus 5.5 b21fa0f7f2 Release 1.1.2 — the default path works end to end
Fix release for 1.1.1: the minimal path end to end, engine commands that
run on Godot, Unity and Unreal, hook warnings you can see, and verdicts
that say when they could not check. Details in CHANGELOG.md; upgrade
steps in UPGRADING.md (v1.1.1 → v1.1.2).

Fixes #67
Fixes #131

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01WuJn2FdynEybfL5KC697nJ
2026-09-29 21:32:19 +10:00

2.3 KiB

Milestone: [Name]

Overview

  • Target Date: [Date]
  • Type: [Prototype | Vertical Slice | Alpha | Beta | Gold | Post-Launch]
  • Duration: [N weeks]
  • Number of Sprints: [N]

Milestone Goal

[2-3 sentences describing what this milestone achieves and why it matters. What can we demonstrate or evaluate at the end of this milestone?]

Success Criteria

[Specific, measurable criteria. The milestone is complete ONLY when all of these are met.]

  • [Criterion 1 -- specific and testable]
  • [Criterion 2]
  • [Criterion 3]
  • All S1 and S2 bugs resolved
  • Performance within budget on target hardware
  • Build stable for [X] consecutive days

Feature List

Must Ship (Milestone Fails Without These)

Feature Design Doc Owner Sprint Target Status

Should Ship (Planned but Cuttable)

Feature Design Doc Owner Sprint Target Cut Impact Status

Stretch Goals (Only if Ahead of Schedule)

Feature Design Doc Owner Value Add

Quality Gates

Gate Threshold Measurement Method
Crash rate < [X] per hour Automated crash reporting
Frame rate > [X] FPS on min spec Performance profiling
Load time < [X] seconds Automated timing
Critical bugs 0 open S1 Bug tracker
High-severity bugs < [X] open S2 High Bug tracker
Test coverage > [X]% Test framework report

Risk Register

Risk Probability Impact Mitigation Owner Status

Dependencies

Internal Dependencies

Feature Depends On Owner of Dependency Status

External Dependencies

Dependency Provider Status Risk if Delayed

Review Schedule

Date Review Type Attendees
[Week 2] Early progress check Producer, Directors
[Midpoint] Mid-milestone review Full team
[Week N-1] Pre-milestone review Full team
[Target Date] Milestone review Full team