mirror of
https://github.com/Donchitos/Claude-Code-Game-Studios.git
synced 2026-06-27 13:01:50 +00:00
Closes the gap where /design-system, story lifecycle, gate-check transitions, UX pipeline, and brownfield adoption had no worked examples. Adds visual ASCII flow diagrams for the full 7-phase pipeline and 4 detailed skill chains. New files: - docs/examples/session-design-system-skill.md - docs/examples/session-story-lifecycle.md - docs/examples/session-gate-check-phase-transition.md - docs/examples/session-ux-pipeline.md - docs/examples/session-adopt-brownfield.md - docs/examples/skill-flow-diagrams.md Updated: - docs/examples/README.md — reorganized with Core Workflow / Foundational sections - .claude/docs/quick-start.md — synced - docs/WORKFLOW-GUIDE.md — synced Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
228 lines
13 KiB
Markdown
228 lines
13 KiB
Markdown
# Skill Flow Diagrams
|
||
|
||
Visual maps of how skills chain together across the 7 development phases.
|
||
These show what runs before and after each skill, and what artifacts flow between them.
|
||
|
||
---
|
||
|
||
## Full Pipeline Overview (Zero to Ship)
|
||
|
||
```
|
||
PHASE 1: CONCEPT
|
||
/start ──────────────────────────────────────────────────────► routes to A/B/C/D
|
||
/brainstorm ──────────────────────────────────────────────────► design/gdd/game-concept.md
|
||
/setup-engine ────────────────────────────────────────────────► CLAUDE.md + technical-preferences.md
|
||
/design-review [game-concept.md] ────────────────────────────► concept validated
|
||
/gate-check ─────────────────────────────────────────────────► PASS → advance to systems-design
|
||
│
|
||
▼
|
||
PHASE 2: SYSTEMS DESIGN
|
||
/map-systems ────────────────────────────────────────────────► design/gdd/systems-index.md
|
||
│
|
||
▼ (for each system, in dependency order)
|
||
/design-system [name] ──────────────────────────────────────► design/gdd/[system].md
|
||
/design-review [system].md ─────────────────────────────────► per-GDD review comments
|
||
│
|
||
▼ (after all MVP GDDs done)
|
||
/review-all-gdds ────────────────────────────────────────────► design/gdd/gdd-cross-review-[date].md
|
||
/gate-check ─────────────────────────────────────────────────► PASS → advance to technical-setup
|
||
│
|
||
▼
|
||
PHASE 3: TECHNICAL SETUP
|
||
/create-architecture ────────────────────────────────────────► docs/architecture/master.md
|
||
/architecture-decision (×N) ─────────────────────────────────► docs/architecture/[adr-nnn].md
|
||
/architecture-review ────────────────────────────────────────► review report + docs/architecture/tr-registry.yaml
|
||
/create-control-manifest ────────────────────────────────────► docs/architecture/control-manifest.md
|
||
/gate-check ─────────────────────────────────────────────────► PASS → advance to pre-production
|
||
│
|
||
▼
|
||
PHASE 4: PRE-PRODUCTION
|
||
/ux-design [screen/hud/patterns] ────────────────────────────► design/ux/*.md
|
||
/ux-review ──────────────────────────────────────────────────► UX specs approved
|
||
/create-epics-stories ───────────────────────────────────────► production/stories/STORY-*.md
|
||
/prototype [core-mechanic] ──────────────────────────────────► prototypes/[name]/
|
||
/playtest-report ────────────────────────────────────────────► tests/playtest/vertical-slice.md
|
||
/sprint-plan new ────────────────────────────────────────────► production/sprints/sprint-01.md
|
||
/gate-check ─────────────────────────────────────────────────► PASS → advance to production
|
||
│
|
||
▼
|
||
PHASE 5: PRODUCTION (repeating sprint loop)
|
||
/sprint-status ──────────────────────────────────────────────► sprint snapshot
|
||
/story-readiness [story] ────────────────────────────────────► story validated READY
|
||
│
|
||
▼ implement (gameplay-programmer, etc.)
|
||
/story-done [story] ─────────────────────────────────────────► story closed + next surfaced
|
||
/sprint-plan [next] ─────────────────────────────────────────► next sprint
|
||
│
|
||
▼ (after Production milestone)
|
||
/milestone-review ───────────────────────────────────────────► milestone report
|
||
/gate-check ─────────────────────────────────────────────────► PASS → advance to polish
|
||
│
|
||
▼
|
||
PHASE 6: POLISH
|
||
/perf-profile ───────────────────────────────────────────────► perf report + fixes
|
||
/balance-check ──────────────────────────────────────────────► balance report + fixes
|
||
/tech-debt ──────────────────────────────────────────────────► docs/tech-debt-register.md
|
||
/team-polish ────────────────────────────────────────────────► polish sprint orchestrated
|
||
/gate-check ─────────────────────────────────────────────────► PASS → advance to release
|
||
│
|
||
▼
|
||
PHASE 7: RELEASE
|
||
/launch-checklist ───────────────────────────────────────────► launch readiness report
|
||
/release-checklist ──────────────────────────────────────────► platform-specific checklist
|
||
/changelog ──────────────────────────────────────────────────► CHANGELOG.md
|
||
/patch-notes ────────────────────────────────────────────────► player-facing notes
|
||
/team-release ───────────────────────────────────────────────► release pipeline orchestrated
|
||
```
|
||
|
||
---
|
||
|
||
## Skill Chain: /design-system in Detail
|
||
|
||
How a single GDD gets authored, reviewed, and handed to architecture:
|
||
|
||
```
|
||
systems-index.md (input)
|
||
game-concept.md (input)
|
||
upstream GDDs (input, if any)
|
||
│
|
||
▼
|
||
/design-system [name]
|
||
│
|
||
├── Pre-check: feasibility table + engine risk flags
|
||
│
|
||
├── Section cycle × 8:
|
||
│ question → options → decision → draft → approval → WRITE
|
||
│ [each section written to file immediately after approval]
|
||
│
|
||
└── Output: design/gdd/[system].md (complete, all 8 sections)
|
||
│
|
||
▼
|
||
/design-review design/gdd/[system].md
|
||
│
|
||
├── APPROVED → mark DONE in systems-index, proceed to next system
|
||
├── NEEDS REVISION → agent shows specific issues, re-enter section cycle
|
||
└── MAJOR REVISION → significant redesign needed before next system
|
||
│
|
||
▼ (after all MVP GDDs + cross-review)
|
||
/review-all-gdds
|
||
│
|
||
└── Output: gdd-cross-review-[date].md
|
||
```
|
||
|
||
---
|
||
|
||
## Skill Chain: Story Lifecycle in Detail
|
||
|
||
How a story gets from backlog to closed:
|
||
|
||
```
|
||
/create-epics-stories
|
||
│
|
||
└── Output: production/stories/STORY-[SYS]-NNN.md
|
||
(Status: backlog or blocked if ADR is Proposed)
|
||
│
|
||
▼
|
||
/story-readiness [story]
|
||
│
|
||
├── READY → Status: ready-for-dev → pick up for implementation
|
||
├── NEEDS WORK → agent shows specific gaps → resolve → re-run readiness
|
||
└── BLOCKED → ADR still Proposed, or upstream story incomplete
|
||
│
|
||
▼ (after READY)
|
||
Implementation (gameplay-programmer, etc.)
|
||
│
|
||
▼
|
||
/story-done [story]
|
||
│
|
||
├── COMPLETE → Status: Complete, sprint-status.yaml updated, next story surfaced
|
||
├── COMPLETE WITH NOTES → complete but some criteria deferred (logged)
|
||
└── BLOCKED → acceptance criteria cannot be verified → investigate blocker
|
||
```
|
||
|
||
---
|
||
|
||
## Skill Chain: UX Pipeline in Detail
|
||
|
||
```
|
||
design/gdd/*.md (UX requirements extracted)
|
||
design/player-journey.md (emotional arc)
|
||
│
|
||
▼
|
||
/ux-design hud → design/ux/hud.md
|
||
/ux-design screen [name] → design/ux/screens/[name].md
|
||
/ux-design patterns → design/ux/interaction-patterns.md
|
||
│
|
||
▼
|
||
/ux-review design/ux/
|
||
│
|
||
├── APPROVED → all specs ready for /team-ui
|
||
├── NEEDS REVISION → blocking issues listed → fix → re-run review
|
||
└── MAJOR REVISION → fundamental UX problems → significant redesign
|
||
│
|
||
▼ (after APPROVED)
|
||
/team-ui
|
||
│
|
||
├── Phase 1: context load + /ux-design (if specs missing)
|
||
├── Phase 2: visual design (art-director)
|
||
├── Phase 3: layout implementation (ui-programmer)
|
||
├── Phase 4: accessibility audit (accessibility-specialist)
|
||
└── Phase 5: final review
|
||
```
|
||
|
||
---
|
||
|
||
## Brownfield Onboarding Flow
|
||
|
||
For projects with existing work (use `/start` option D or run directly):
|
||
|
||
```
|
||
/project-stage-detect → stage detection report
|
||
│
|
||
▼
|
||
/adopt
|
||
│
|
||
├── Phase 1: detect what exists
|
||
├── Phase 2: FORMAT audit (not just existence)
|
||
├── Phase 3: classify gaps (BLOCKING / HIGH / MEDIUM / LOW)
|
||
├── Phase 4: ordered migration plan
|
||
├── Phase 5: write docs/adoption-plan-[date].md
|
||
└── Phase 6: fix most urgent gap inline (optional)
|
||
│
|
||
▼
|
||
/design-system retrofit [path] → fills missing GDD sections
|
||
/architecture-decision retrofit [path] → fills missing ADR sections
|
||
/gate-check → where are you in the pipeline?
|
||
```
|
||
|
||
---
|
||
|
||
## How to Read These Diagrams
|
||
|
||
| Symbol | Meaning |
|
||
|--------|---------|
|
||
| `──►` | Produces this artifact |
|
||
| `│ ▼` | Flows into next step |
|
||
| `├──` | Branch (multiple possible outcomes) |
|
||
| `×N` | Runs N times (once per system, story, etc.) |
|
||
| `(input)` | Read by the skill but not produced here |
|
||
| `[optional]` | Not required for the gate to pass |
|
||
| `WRITE` (caps) | File written to disk immediately |
|
||
|
||
---
|
||
|
||
## Common Entry Points
|
||
|
||
| Where you are | Run this |
|
||
|---------------|---------|
|
||
| Brand new, no idea | `/start` → `/brainstorm` |
|
||
| Have a concept, no engine | `/setup-engine` |
|
||
| Have concept + engine | `/map-systems` |
|
||
| Mid-systems design | `/design-system [next system]` or `/map-systems next` |
|
||
| All GDDs done | `/review-all-gdds` → `/gate-check` |
|
||
| In technical setup | `/create-architecture` → `/architecture-decision` |
|
||
| Have stories, ready to code | `/story-readiness [story]` |
|
||
| Story done | `/story-done [story]` |
|
||
| Not sure | `/help` |
|
||
| Existing project | `/adopt` |
|