Files
Claude-Code-Game-Studios/.claude/skills/day-one-patch/SKILL.md
Donchitos 984023ddac Release v1.0.0 — concept-prototype/vertical-slice split, workflow restructure, polish (#50)
* Add /vertical-slice skill, prototype overhaul, and workflow integration

- Add /vertical-slice skill for pre-production validation (Phase 4 gate)
- Overhaul /prototype skill with two-mode design: concept prototype (Phase 1)
  vs vertical slice (Phase 4), with clearer differentiation and higher standards for VS
- Update prototyper agent to own both prototype and vertical-slice workflows
- Add prototype-report.md and vertical-slice-report.md output templates
- Update WORKFLOW-GUIDE, quick-start, skills-reference, agent-coordination-map,
  and skill-flow-diagrams to fully integrate both skills into the 7-phase pipeline
- Remove orphaned empty quick-prototype/ directory

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>

* sync v1 counts + polish

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>

* Add entity inventory flow, relax vertical-slice gate, improve UX authoring prompts

- /asset-spec: new Phase 0b entity & screen inventory when no argument and no
  existing inventory — reads GDDs/art-bible, proposes categorized list, writes
  design/assets/entity-inventory.md collaboratively
- /asset-spec: entity/character target falls back to inline user description
  when no source doc exists, rather than failing
- /gate-check: vertical slice changed from blocking to CONCERNS-only when
  absent; built-but-broken slice still fails; adds entity inventory as gate artifact
- /ux-design: convert inline approval prompts to AskUserQuestion for structured
  option capture at key authoring decision points
- workflow-catalog.yaml: entity-inventory step added to pre-production; UX spec
  min_count raised to 3; vertical-slice and prototype marked required: false with
  updated descriptions
- .gitignore: exclude marrow/ eval tooling directory

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>

* Add missing AskUserQuestion widgets to 7 skills

Audit found 11 decision points across 7 skills where structured option
prompts were missing — using plain text, auto-selection, or no gate at all.

Skills patched:
- create-epics: per-epic approval + producer CONCERNS verdict
- sprint-plan: producer CONCERNS verdict with scope/timeline options
- milestone-review: AT RISK / OFF TRACK producer verdicts require acknowledgement
- retrospective: existing-retro handling converted from plain text [A]/[B]
- quick-design: classification confirmation + draft approve/revise/redirect
- tech-debt add mode: category (6 options) + effort (S/M/L/XL) structured capture
- regression-suite: no-arg mode selection instead of silent auto-detect
- hotfix: severity confirmation gate before workflow begins

Also added AskUserQuestion to allowed-tools headers for retrospective,
quick-design, tech-debt, regression-suite, and hotfix.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>

* Prep v1 stable: fix WORKFLOW-GUIDE counts, stale agent names, and skill model fields

- WORKFLOW-GUIDE.md: correct agent count (48→49), skill count (66/68→73),
  add 6 missing skills to Appendix B, fix Creative category count (2→4),
  replace 3 non-existent agent names with correct ue-*/unity-* specialists,
  add missing godot-csharp/gdextension specialists to hierarchy,
  fix production/stories/ paths → production/epics/
- coordination-rules.md: replace "not yet used" with opt-in env var note
- quick-start.md: rename duplicate "Validate the concept" label → "Prototype the mechanic"
- skill-flow-diagrams.md: remove duplicate legacy UX pipeline section
- All 62 skills missing model: field now have explicit model: sonnet

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>

* fix: comprehensive skill audit — consistency, UX, and flow gaps

Two-pass audit fixing ~35 bugs across 41 files.

Pre-production flow:
- Brainstorm next-steps split into Path A (design-first) and Path B
  (prototype-first) — eliminates "prototype after architecture" confusion
- /architecture-review added to pre-production flow in brainstorm and
  create-architecture handoffs
- gate-check traceability check corrected to requirements-traceability.md
- dev-story TR registry error now points to /architecture-review (not /create-epics)
- start now writes production/stage.txt on first onboarding

AskUserQuestion gaps filled:
- balance-check, code-review, hotfix, day-one-patch, consistency-check
  all gain closing widgets and/or missing allowed-tools declarations
- hotfix git branch creation now requires user confirmation
- sprint-plan review-mode setup moved to Phase 0 (before gates run)
- team-combat gains architecture→implementation approval gate
- design-review APPROVED path consolidated from 3 widgets to 1 multiSelect

All 9 team-* skills:
- Phase 0 review-mode resolution added (solo/lean/full now respected)
- team-audio output path fixed (design/gdd/ → design/audio/)
- team-level final doc compilation delegated to level-designer subagent
- team-narrative localization-lead added to composition list
- team-qa sprint path fixed (flat files, not directories)
- team-release NO-GO override captures written justification
- team-live-ops Cancel verdict now explicitly BLOCKED

Other fixes:
- Art bible path standardized to design/art/art-bible.md (3 wrong refs)
- AD-PHASE-GATE added to lean-mode skip list in director-gates.md
- design-system duplicate 5d heading fixed; skeleton decline path added;
  mandatory agent spawns now respect review mode
- story-readiness acceptance criteria thresholds now type-aware
- create-stories gains multi-ADR and no-ADR handling guidance
- consistency-check creates docs/consistency-failures.md on first run
- retrospective frontmatter bash injection replaced with explicit Bash call
- smoke-check ls -t gains PowerShell fallback
- Conventional Commits format documented in coding-standards.md
- gate-check: ADR acceptance gate, QA plan check, chain-of-verification
  tool-action requirement all added

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>

* fix: expose --review flag in argument-hints for all team-* skills

All 9 team-* skills already implement Phase 0 review-mode resolution
internally (full/lean/solo), but none advertised [--review full|lean|solo]
in their argument-hint. Users had no way to discover the per-run override.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>

* docs: add SECURITY.md with coordinated disclosure policy

Defines scope, reporting process (GitHub private vulnerability reporting),
contributor security guidelines for hooks/skills/agents, and 90-day
coordinated disclosure timeline.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>

* docs: add CONTRIBUTING.md with framework contribution guidelines

Covers what PRs are welcome, skill/hook/agent technical requirements,
the collaborative principle, testing expectations, commit format,
and platform compatibility requirements.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>

* docs: add v1.0.0-beta → v1.0 upgrade section to UPGRADING.md

Documents the 17 commits since the beta tag: new /vertical-slice gate,
entity inventory flow in /map-systems, AskUserQuestion widgets across
7 skills, --review flag exposure on team-* skills, bug fixes
(#21, #36, #42, #43, #45), and the new CONTRIBUTING.md and SECURITY.md.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

---------

Co-authored-by: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-05-13 20:15:08 +10:00

8.3 KiB
Raw Blame History

name, description, argument-hint, user-invocable, allowed-tools, model
name description argument-hint user-invocable allowed-tools model
day-one-patch Prepare a day-one patch for a game launch. Scopes, prioritises, implements, and QA-gates a focused patch addressing known issues discovered after gold master but before or immediately after public launch. Treats the patch as a mini-sprint with its own QA gate and rollback plan. [scope: known-bugs | cert-feedback | all] true Read, Glob, Grep, Write, Edit, Bash, Task, AskUserQuestion sonnet

Day-One Patch

Every shipped game has a day-one patch. Planning it before launch day prevents chaos. This skill scopes the patch to only what is safe and necessary, gates it through a lightweight QA pass, and ensures a rollback plan exists before anything ships. It is a mini-sprint — not a hotfix, not a full sprint.

When to run:

  • After the gold master build is locked (cert approved or launch candidate tagged)
  • When known bugs exist that are too risky to address in the gold master
  • When cert feedback requires minor fixes post-submission
  • When a pre-launch playtest surfaces must-fix issues after the release gate passed

Day-one patch scope rules:

  • Only P1/P2 bugs that are SAFE to fix quickly
  • No new features — this is fix-only
  • No refactoring — minimum viable change
  • Any fix that requires more than 4 hours of dev time belongs in patch 1.1, not day-one

Output: production/releases/day-one-patch-[version].md


Phase 1: Load Release Context

Read:

  • production/stage.txt — confirm project is in Release stage
  • The most recent file in production/gate-checks/ — read the release gate verdict
  • production/qa/bugs/*.md — load all bugs with Status: Open or Fixed — Pending Verification
  • production/sprints/ most recent — understand what shipped
  • production/security/security-audit-*.md most recent — check for any open security items

If production/stage.txt is not Release or Polish:

"Day-one patch prep is for Release-stage projects. Current stage: [stage]. This skill is not appropriate until you are approaching launch."


Phase 2: Scope the Patch

Step 2a — Classify open bugs for patch inclusion

For each open bug, evaluate:

Criterion Include in day-one?
S1 or S2 severity Yes — must include if safe to fix
P1 priority Yes
Fix estimated < 4 hours Yes
Fix requires architecture change No — defer to 1.1
Fix introduces new code paths No — too risky
Fix is data/config only (no code change) Yes — very low risk
Cert feedback requirement Yes — required for platform approval
S3/S4 severity Only if trivial config fix; otherwise defer

Step 2b — Present patch scope to user

Use AskUserQuestion:

  • Prompt: "Based on open bugs and cert feedback, here is the proposed day-one patch scope. Does this look right?"
  • Show: table of included bugs (ID, severity, description, estimated effort)
  • Show: table of deferred bugs (ID, severity, reason deferred)
  • Options: [A] Approve this scope / [B] Adjust — I want to add or remove items / [C] No day-one patch needed

If [C]: output "No day-one patch required. Proceed to /launch-checklist." Stop.

Step 2c — Check total scope

Sum estimated effort. If total exceeds 1 day of work:

"⚠️ Patch scope is [N hours] — this exceeds a safe day-one window. Consider deferring lower-priority items to patch 1.1. A bloated day-one patch introduces more risk than it removes."

Use AskUserQuestion to confirm proceeding or reduce scope.


Phase 3: Rollback Plan

Before any code is written, define the rollback procedure. This is non-negotiable.

Spawn release-manager via Task. Ask them to produce a rollback plan covering:

  • How to revert to the gold master build on each target platform
  • Platform-specific rollback constraints (some platforms cannot roll back cert builds)
  • Who is responsible for triggering the rollback
  • What player communication is required if a rollback occurs

Present the rollback plan. Ask: "May I write this rollback plan to production/releases/rollback-plan-[version].md?"

Do not proceed to Phase 4 until the rollback plan is written.


Phase 4: Implement Fixes

For each bug in the approved scope, spawn a focused implementation loop:

  1. Spawn lead-programmer via Task with:

    • The bug report (exact reproduction steps and root cause if known)
    • The constraint: minimum viable fix only, no cleanup
    • The affected files (from bug report Technical Context section)
  2. The lead-programmer implements and runs targeted tests.

  3. Spawn qa-tester via Task to verify: does the bug reproduce after the fix?

For config/data-only fixes: make the change directly (no programmer agent needed). Confirm the value changed and re-run any relevant smoke test.


Phase 5: Patch QA Gate

This is a lightweight QA pass — not a full /team-qa. The patch is already QA-approved from the release gate; we are only re-verifying the changed areas.

Spawn qa-lead via Task with:

  • List of all changed files
  • List of bugs fixed (with verification status from Phase 4)
  • The smoke check scope for the affected systems

Ask qa-lead to determine: Is a targeted smoke check sufficient, or do any fixes touch systems that require a broader regression?

Run the required QA scope:

  • Targeted smoke check — run /smoke-check [affected-systems]
  • Broader regression — run targeted tests in tests/unit/ and tests/integration/ for affected systems

QA verdict must be PASS or PASS WITH WARNINGS before proceeding. If FAIL: scope the failing fix out of the day-one patch and defer to 1.1.


Phase 6: Generate Patch Record

# Day-One Patch: [Game Name] v[version]

**Date prepared**: [date]
**Target release**: [launch date or "day of launch"]
**Base build**: [gold master tag or commit]
**Patch build**: [patch tag or commit]

---

## Patch Notes (Internal)

### Bugs Fixed
| BUG-ID | Severity | Description | Fix summary |
|--------|----------|-------------|-------------|
| BUG-NNN | S[1-4] | [description] | [one-line fix] |

### Deferred to 1.1
| BUG-ID | Severity | Description | Reason deferred |
|--------|----------|-------------|-----------------|
| BUG-NNN | S[1-4] | [description] | [reason] |

---

## QA Sign-Off

**QA scope**: [Targeted smoke / Broader regression]
**Verdict**: [PASS / PASS WITH WARNINGS]
**QA lead**: qa-lead agent
**Date**: [date]
**Warnings (if any)**: [list or "None"]

---

## Rollback Plan

See: `production/releases/rollback-plan-[version].md`

**Trigger condition**: If [N] or more S1 bugs are reported within [X] hours of launch, execute rollback.
**Rollback owner**: [user / producer]

---

## Approvals Required Before Deploy

- [ ] lead-programmer: all fixes reviewed
- [ ] qa-lead: QA gate PASS confirmed
- [ ] producer: deployment timing approved
- [ ] release-manager: platform submission confirmed

---

## Player-Facing Patch Notes

[Draft for community-manager to review before publishing]

[list player-facing changes in plain language]

Ask: "May I write this patch record to production/releases/day-one-patch-[version].md?"


Phase 7: Next Steps

After the patch record is written:

  1. Run /patch-notes to generate the player-facing version of the patch notes
  2. Run /bug-report verify [BUG-ID] for each fixed bug after the patch is live
  3. Run /bug-report close [BUG-ID] for each verified fix
  4. Schedule a post-launch review 4872 hours after launch using /retrospective launch

If any S1 bugs remain open after the patch:

"⚠️ S1 bugs remain open and were not patched. These are accepted risks. Document them in the rollback plan trigger conditions — if they occur at scale, rollback may be preferable to a follow-up patch."

Use AskUserQuestion:

  • Prompt: "Day-one patch complete. What's next?"
  • Options:
    • [A] Run /patch-notes — generate player-facing patch notes
    • [B] Run /bug-report to log any issues found post-deploy
    • [C] Stop here

Collaborative Protocol

  • Scope discipline is everything — resist scope creep; every addition increases risk
  • Rollback plan first, always — a patch without a rollback plan is irresponsible
  • Deferred is not forgotten — every deferred bug gets a 1.1 ticket automatically
  • Player communication is part of the patch/patch-notes is a required output, not optional