Files
Claude-Code-Game-Studios/.claude/docs/templates/risk-register-entry.md
Donchitos ad540fe75d Game Studio Agent Architecture — complete setup (Phases 1-7)
48 coordinated Claude Code subagents for indie game development:
- 3 leadership agents (creative-director, technical-director, producer)
- 10 department leads (game-designer, lead-programmer, art-director, etc.)
- 23 specialist agents (gameplay, engine, AI, networking, UI, tools, etc.)
- 12 engine-specific agents (Godot, Unity, Unreal with sub-specialists)

Infrastructure:
- 34 skills (slash commands) for workflows, reviews, and team orchestration
- 8 hooks for commit validation, asset checks, session management
- 11 path-scoped rules enforcing domain-specific standards
- 28 templates for design docs, reports, and collaborative protocols

Key features:
- User-driven collaboration protocol (Question → Options → Decision → Draft → Approval)
- Engine version awareness with knowledge-gap detection (Godot 4.6 pinned)
- Phase gate system for development milestone validation
- CLAUDE.md kept under 80 lines with extracted doc imports

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-13 21:04:24 +11:00

59 lines
1.4 KiB
Markdown

# Risk: [Short Title]
## Identification
- **ID**: RISK-[NNNN]
- **Identified By**: [Agent or person]
- **Date Identified**: [Date]
- **Category**: [Technical | Design | Schedule | Resource | External | Quality]
## Assessment
- **Probability**: [Very Low | Low | Medium | High | Very High]
- **Impact**: [Minimal | Minor | Moderate | Major | Critical]
- **Risk Score**: [Probability x Impact = Low / Medium / High / Critical]
## Description
[Detailed description of the risk. What could go wrong? Under what conditions?]
## Trigger Conditions
[What observable conditions would indicate this risk is materializing?]
- [Condition 1]
- [Condition 2]
## Impact Analysis
### If This Risk Materializes
- **Schedule Impact**: [How many days/weeks of delay]
- **Quality Impact**: [What quality degradation]
- **Scope Impact**: [What features affected]
- **Cost Impact**: [Resource cost of dealing with it]
### Affected Systems/Features
- [System 1]
- [System 2]
## Mitigation Strategy
### Prevention (reduce probability)
- [Action to prevent this risk from occurring]
- [Owner and deadline for prevention action]
### Contingency (reduce impact if it occurs)
- [Action to take if this risk materializes]
- [Owner responsible for contingency execution]
## Current Status
- **Status**: [Open | Mitigating | Occurred | Closed]
- **Last Reviewed**: [Date]
- **Trend**: [Increasing | Stable | Decreasing]
- **Notes**: [Any updates]