Files
Claude-Code-Game-Studios/.claude/skills/milestone-review/SKILL.md
Donchitos b139bcf087 Add director gates system: shared review checkpoints across all workflow skills
Creates .claude/docs/director-gates.md as a central registry of 18 named gate
prompts (CD-*, TD-*, PR-*, LP-*, QL-*, ND-*, AD-*) covering all 7 production
stages. Skills now reference gate IDs instead of embedding inline director prompts,
eliminating drift when prompts need updating.

Updated 15 skills to use gate IDs: brainstorm, map-systems, design-system,
architecture-decision, create-architecture, create-epics, create-stories,
sprint-plan, milestone-review, playtest-report, prototype, story-done,
gate-check, setup-engine, start.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-29 17:24:06 +11:00

3.7 KiB

name, description, argument-hint, user-invocable, allowed-tools
name description argument-hint user-invocable allowed-tools
milestone-review Generates a comprehensive milestone progress review including feature completeness, quality metrics, risk assessment, and go/no-go recommendation. Use at milestone checkpoints or when evaluating readiness for a milestone deadline. [milestone-name|current] true Read, Glob, Grep, Write

Phase 1: Load Milestone Data

Read the milestone definition from production/milestones/. If the argument is current, use the most recently modified milestone file.

Read all sprint reports for sprints within this milestone from production/sprints/.


Phase 2: Scan Codebase Health

  • Scan for TODO, FIXME, HACK markers that indicate incomplete work
  • Check the risk register at production/risk-register/

Phase 3: Generate the Milestone Review

# Milestone Review: [Milestone Name]

## Overview
- **Target Date**: [Date]
- **Current Date**: [Today]
- **Days Remaining**: [N]
- **Sprints Completed**: [X/Y]

## Feature Completeness

### Fully Complete
| Feature | Acceptance Criteria | Test Status |
|---------|-------------------|-------------|

### Partially Complete
| Feature | % Done | Remaining Work | Risk to Milestone |
|---------|--------|---------------|------------------|

### Not Started
| Feature | Priority | Can Cut? | Impact of Cutting |
|---------|----------|----------|------------------|

## Quality Metrics
- **Open S1 Bugs**: [N] -- [List]
- **Open S2 Bugs**: [N]
- **Open S3 Bugs**: [N]
- **Test Coverage**: [X%]
- **Performance**: [Within budget? Details]

## Code Health
- **TODO count**: [N across codebase]
- **FIXME count**: [N]
- **HACK count**: [N]
- **Technical debt items**: [List critical ones]

## Risk Assessment
| Risk | Status | Impact if Realized | Mitigation Status |
|------|--------|-------------------|------------------|

## Velocity Analysis
- **Planned vs Completed** (across all sprints): [X/Y tasks = Z%]
- **Trend**: [Improving / Stable / Declining]
- **Adjusted estimate for remaining work**: [Days needed at current velocity]

## Scope Recommendations
### Protect (Must ship with milestone)
- [Feature and why]

### At Risk (May need to cut or simplify)
- [Feature and risk]

### Cut Candidates (Can defer without compromising milestone)
- [Feature and impact of cutting]

## Go/No-Go Assessment

**Recommendation**: [GO / CONDITIONAL GO / NO-GO]

**Conditions** (if conditional):
- [Condition 1 that must be met]
- [Condition 2 that must be met]

**Rationale**: [Explanation of the recommendation]

## Action Items
| # | Action | Owner | Deadline |
|---|--------|-------|----------|

Phase 3b: Producer Risk Assessment

Before generating the Go/No-Go recommendation, spawn producer via Task using gate PR-MILESTONE (.claude/docs/director-gates.md).

Pass: milestone name and target date, current completion percentage, blocked story count, velocity data from sprint reports (if available), list of cut candidates.

Present the producer's assessment inline within the Go/No-Go section. The producer's verdict (ON TRACK / AT RISK / OFF TRACK) informs the overall recommendation — do not issue a GO against an OFF TRACK producer verdict without explicit user acknowledgement.


Phase 4: Save Review

Present the review to the user.

Ask: "May I write this to production/milestones/[milestone-name]-review.md?"

If yes, write the file, creating the directory if needed. Verdict: COMPLETE — milestone review saved.

If no, stop here. Verdict: BLOCKED — user declined write.


Phase 5: Next Steps

  • Run /gate-check for a formal phase gate verdict if this milestone marks a development phase boundary.
  • Run /sprint-plan to adjust the next sprint based on the scope recommendations above.