mirror of
https://github.com/Donchitos/Claude-Code-Game-Studios.git
synced 2026-10-16 01:37:05 +00:00
Fix release for 1.1.1: the minimal path end to end, engine commands that run on Godot, Unity and Unreal, hook warnings you can see, and verdicts that say when they could not check. Details in CHANGELOG.md; upgrade steps in UPGRADING.md (v1.1.1 → v1.1.2). Fixes #67 Fixes #131 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01WuJn2FdynEybfL5KC697nJ
32 lines
1.7 KiB
Markdown
32 lines
1.7 KiB
Markdown
> Gate definition. The spawning skill passes this file's path to the director agent; the AGENT reads it — the parent session should not.
|
|
|
|
# PR-EPIC — Epic Structure Feasibility Review
|
|
|
|
Agent: `producer` | Model tier: Opus | Domain: Scope, timeline, dependencies, production risk
|
|
|
|
**Trigger**: After epics are defined by `/create-epics`, before stories are
|
|
broken out — validates the epic structure is producible before `/create-stories`
|
|
is invoked
|
|
|
|
**Context to pass**:
|
|
- The epic structure for the layer, inline — every epic's scope summary and
|
|
governing-ADR count. `/create-epics` runs this gate *before* writing any epic
|
|
file, so there are no paths yet.
|
|
- Milestone timeline and target dates
|
|
- Team capacity (solo / small team / size)
|
|
- Layer being epiced (Foundation / Core / Feature / etc.)
|
|
|
|
**Prompt**:
|
|
> "Review this epic structure for production feasibility before story breakdown
|
|
> begins. Are the epic boundaries scoped appropriately — could each epic realistically
|
|
> complete before a milestone deadline? Are epics correctly ordered by system
|
|
> dependency — does any epic require another epic's output before it can start?
|
|
> Are any epics underscoped (too small, should merge) or overscoped (too large,
|
|
> should split into 2-3 focused epics)? Are the Foundation-layer epics scoped to
|
|
> allow Core-layer epics to begin at the start of the next sprint after Foundation
|
|
> completes? Return REALISTIC (epic structure is producible), CONCERNS [specific
|
|
> structural adjustments before stories are written], or UNREALISTIC [epics must
|
|
> be split, merged, or reordered — story breakdown cannot begin until resolved]."
|
|
|
|
**Verdicts**: REALISTIC / CONCERNS / UNREALISTIC
|