Files
Claude-Code-Game-Studios/.claude/docs/director-gates/pr-epic.md
T
DonchitosandClaude Opus 5.5 b21fa0f7f2 Release 1.1.2 — the default path works end to end
Fix release for 1.1.1: the minimal path end to end, engine commands that
run on Godot, Unity and Unreal, hook warnings you can see, and verdicts
that say when they could not check. Details in CHANGELOG.md; upgrade
steps in UPGRADING.md (v1.1.1 → v1.1.2).

Fixes #67
Fixes #131

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01WuJn2FdynEybfL5KC697nJ
2026-09-29 21:32:19 +10:00

32 lines
1.7 KiB
Markdown

> Gate definition. The spawning skill passes this file's path to the director agent; the AGENT reads it — the parent session should not.
# PR-EPIC — Epic Structure Feasibility Review
Agent: `producer` | Model tier: Opus | Domain: Scope, timeline, dependencies, production risk
**Trigger**: After epics are defined by `/create-epics`, before stories are
broken out — validates the epic structure is producible before `/create-stories`
is invoked
**Context to pass**:
- The epic structure for the layer, inline — every epic's scope summary and
governing-ADR count. `/create-epics` runs this gate *before* writing any epic
file, so there are no paths yet.
- Milestone timeline and target dates
- Team capacity (solo / small team / size)
- Layer being epiced (Foundation / Core / Feature / etc.)
**Prompt**:
> "Review this epic structure for production feasibility before story breakdown
> begins. Are the epic boundaries scoped appropriately — could each epic realistically
> complete before a milestone deadline? Are epics correctly ordered by system
> dependency — does any epic require another epic's output before it can start?
> Are any epics underscoped (too small, should merge) or overscoped (too large,
> should split into 2-3 focused epics)? Are the Foundation-layer epics scoped to
> allow Core-layer epics to begin at the start of the next sprint after Foundation
> completes? Return REALISTIC (epic structure is producible), CONCERNS [specific
> structural adjustments before stories are written], or UNREALISTIC [epics must
> be split, merged, or reordered — story breakdown cannot begin until resolved]."
**Verdicts**: REALISTIC / CONCERNS / UNREALISTIC