Fix release for 1.1.2: the 14 longest skills keep their later phases after a compaction, a question nobody answered is never taken as an answer, settings read the same from a subfolder, the commit check works for a project in a subfolder of a larger repository, every skill opens with a title, and the shipped allow rules no longer approve deleting a branch or writing files without asking. Details in CHANGELOG.md; upgrade steps in UPGRADING.md (v1.1.2 → v1.1.3). Refs #83 Refs #133 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_0185en4t76fPn7315q4c3nko
266 lines
11 KiB
Markdown
266 lines
11 KiB
Markdown
---
|
||
name: day-one-patch
|
||
description: "Day-one launch patch — focused fix for known issues found after gold master. Mini-sprint with QA gate and rollback."
|
||
argument-hint: "[scope: known-bugs | cert-feedback | all]"
|
||
user-invocable: true
|
||
disable-model-invocation: true
|
||
allowed-tools: Read, Glob, Grep, Write, Edit, Bash, Agent, AskUserQuestion
|
||
model: sonnet
|
||
---
|
||
|
||
# Day-One Patch
|
||
|
||
Every shipped game has a day-one patch. Planning it before launch day prevents
|
||
chaos. This skill scopes the patch to only what is safe and necessary, gates it
|
||
through a lightweight QA pass, and ensures a rollback plan exists before anything
|
||
ships. It is a mini-sprint — not a hotfix, not a full sprint.
|
||
|
||
**When to run:**
|
||
- After the gold master build is locked (cert approved or launch candidate tagged)
|
||
- When known bugs exist that are too risky to address in the gold master
|
||
- When cert feedback requires minor fixes post-submission
|
||
- When a pre-launch playtest surfaces must-fix issues after the release gate passed
|
||
|
||
**Day-one patch scope rules:**
|
||
- Only P1/P2 bugs that are SAFE to fix quickly
|
||
- No new features — this is fix-only
|
||
- No refactoring — minimum viable change
|
||
- Any fix that requires more than 4 hours of dev time belongs in patch 1.1, not day-one
|
||
|
||
**Output:** `production/releases/day-one-patch-[version].md`
|
||
|
||
---
|
||
|
||
## Phase 1: Load Release Context
|
||
|
||
Read:
|
||
- `project.stage` in `project.yaml` (fallback `production/stage.txt`) — confirm project is in Release stage
|
||
- The most recent file in `production/gate-checks/` — read the release gate verdict
|
||
- `production/qa/bugs/*.md` — load all bugs with Status: Open or Fixed — Pending Verification
|
||
- `production/sprints/` most recent — understand what shipped
|
||
- `production/security/security-audit-*.md` most recent — check for any open security items
|
||
|
||
If the resolved stage (project.yaml → stage.txt) is not `Release` or `Polish`:
|
||
> "Day-one patch prep is for Release-stage projects. Current stage: [stage]. This skill is not appropriate until you are approaching launch."
|
||
|
||
**Check the premise, do not assume it.** This whole skill rests on there being a
|
||
gold master that already passed a release gate — that premise is what justifies
|
||
its lightweight QA pass instead of a full one. So verify it rather than inferring
|
||
it from the stage value:
|
||
|
||
- **No file in `production/gate-checks/`**, or none recording a release-gate
|
||
verdict: report `Release gate: NOT ASSESSED — no gate-check record found`. Do
|
||
not proceed silently. Say plainly that the reduced QA scope below is justified
|
||
by a gate nobody can find, and ask whether to run `/gate-check` first or
|
||
proceed with a full QA pass instead.
|
||
- **The most recent record is FAIL, CONCERNS or NOT ASSESSED**: name it and stop.
|
||
A day-one patch on top of a build that never passed its gate is not a day-one
|
||
patch; it is the release gate, arriving late and scoped to the wrong changes.
|
||
- `project.stage: Release` on its own does **not** establish this. The stage is a
|
||
claim about where the project is; the gate record is the evidence that it earned
|
||
the position.
|
||
|
||
---
|
||
|
||
## Phase 2: Scope the Patch
|
||
|
||
### Step 2a — Classify open bugs for patch inclusion
|
||
|
||
For each open bug, evaluate:
|
||
|
||
| Criterion | Include in day-one? |
|
||
|-----------|-------------------|
|
||
| S1 or S2 severity | Yes — must include if safe to fix |
|
||
| P1 priority | Yes |
|
||
| Fix estimated < 4 hours | Yes |
|
||
| Fix requires architecture change | No — defer to 1.1 |
|
||
| Fix introduces new code paths | No — too risky |
|
||
| Fix is data/config only (no code change) | Yes — very low risk |
|
||
| Cert feedback requirement | Yes — required for platform approval |
|
||
| S3/S4 severity | Only if trivial config fix; otherwise defer |
|
||
|
||
### Step 2b — Present patch scope to user
|
||
|
||
Use `AskUserQuestion`:
|
||
- Prompt: "Based on open bugs and cert feedback, here is the proposed day-one patch scope. Does this look right?"
|
||
- Show: table of included bugs (ID, severity, description, estimated effort)
|
||
- Show: table of deferred bugs (ID, severity, reason deferred)
|
||
- Options: `[A] Approve this scope` / `[B] Adjust — I want to add or remove items` / `[C] No day-one patch needed`
|
||
|
||
If [C]: output "No day-one patch required. Proceed to `/launch-checklist`." Stop.
|
||
|
||
### Step 2c — Check total scope
|
||
|
||
Sum estimated effort. If total exceeds 1 day of work:
|
||
> "⚠️ Patch scope is [N hours] — this exceeds a safe day-one window. Consider deferring lower-priority items to patch 1.1. A bloated day-one patch introduces more risk than it removes."
|
||
|
||
Use `AskUserQuestion` to confirm proceeding or reduce scope.
|
||
|
||
---
|
||
|
||
## Phase 3: Rollback Plan
|
||
|
||
Before any code is written, define the rollback procedure. This is non-negotiable.
|
||
|
||
Spawn `release-manager` via `Agent`. Ask them to produce a rollback plan covering:
|
||
- How to revert to the gold master build on each target platform
|
||
- Platform-specific rollback constraints (some platforms cannot roll back cert builds)
|
||
- Who is responsible for triggering the rollback
|
||
- What player communication is required if a rollback occurs
|
||
|
||
Present the rollback plan. Ask: "May I write this rollback plan to `production/releases/rollback-plan-[version].md`?"
|
||
|
||
Do not proceed to Phase 4 until the rollback plan is written.
|
||
|
||
---
|
||
|
||
## Phase 4: Implement Fixes
|
||
|
||
For each code fix in the approved scope, spawn a focused implementation loop:
|
||
|
||
1. Spawn `lead-programmer` via `Agent` with:
|
||
- The bug report (exact reproduction steps and root cause if known)
|
||
- The constraint: minimum viable fix only, no cleanup
|
||
- The affected files (from bug report Technical Context section)
|
||
|
||
It returns, for each bug, the minimal fix and the files it would change —
|
||
writing nothing.
|
||
|
||
2. Ask once, for the whole set: "May I apply these fixes? [BUG-ID → files, one
|
||
line each]". No code changes before this approval.
|
||
|
||
3. On yes, hand each approved fix back to `lead-programmer` (a new `Agent` call
|
||
carrying its plan) to implement it and run targeted tests with `commands.test`
|
||
from `project.yaml`, narrowed to the affected suite where the runner allows —
|
||
never a runner line written from memory. If `commands.test` is unset, say so
|
||
and record `Tests: NOT RUN — commands.test unset` for that bug.
|
||
|
||
4. Spawn `qa-tester` via `Agent` to verify: does the bug reproduce after the fix?
|
||
|
||
For config/data-only fixes: make the change directly (no programmer agent needed). First ask, naming the file and the change: "May I edit `[config file]` — `[key]`: [old value] → [new value]?" Confirm the value changed and re-run any relevant smoke test.
|
||
|
||
---
|
||
|
||
## Phase 5: Patch QA Gate
|
||
|
||
This is a lightweight QA pass — not a full `/team-qa`. The patch is already QA-approved from the release gate; we are only re-verifying the changed areas.
|
||
|
||
Spawn `qa-lead` via `Agent` with:
|
||
- List of all changed files
|
||
- List of bugs fixed (with verification status from Phase 4)
|
||
- The smoke check scope for the affected systems
|
||
|
||
Ask qa-lead to determine: **Is a targeted smoke check sufficient, or do any fixes touch systems that require a broader regression?**
|
||
|
||
Run the required QA scope:
|
||
- **Targeted smoke check** — run `/smoke-check` (it takes no system argument)
|
||
- **Broader regression** — run the affected systems' tests in the engine's test root (`tests/unit/` and `tests/integration/` Godot, `Assets/Tests/` Unity, `Source/<Module>/Private/Tests/` Unreal — `.claude/docs/directory-structure.md`) with `commands.test` from `project.yaml`, narrowed to the affected suites where the runner allows — never a runner line written from memory. If `commands.test` is unset, the broader regression is NOT ASSESSED; say so.
|
||
|
||
QA verdict must be PASS or PASS WITH WARNINGS before proceeding. If FAIL: scope the failing fix out of the day-one patch and defer to 1.1.
|
||
|
||
**If the QA verdict is `NOT ASSESSED`, that is not a pass.** `/smoke-check` returns
|
||
it when the suite never ran — no build, no runner, or a result nobody confirmed.
|
||
Do not proceed on it and do not re-read it as PASS WITH WARNINGS: the warnings
|
||
value means somebody looked and saw something minor, and this means nobody looked.
|
||
Either obtain the result (the verdict names what would make it runnable) or defer
|
||
the fix to 1.1. A day-one patch ships to every player who buys the game on day
|
||
one, which is the worst possible audience for an unverified change.
|
||
|
||
---
|
||
|
||
## Phase 6: Generate Patch Record
|
||
|
||
```markdown
|
||
# Day-One Patch: [Game Name] v[version]
|
||
|
||
**Date prepared**: [date]
|
||
**Target release**: [launch date or "day of launch"]
|
||
**Base build**: [gold master tag or commit]
|
||
**Patch build**: [patch tag or commit]
|
||
|
||
---
|
||
|
||
## Patch Notes (Internal)
|
||
|
||
### Bugs Fixed
|
||
| BUG-ID | Severity | Description | Fix summary |
|
||
|--------|----------|-------------|-------------|
|
||
| BUG-NNNN | S[1-4] | [description] | [one-line fix] |
|
||
|
||
### Deferred to 1.1
|
||
| BUG-ID | Severity | Description | Reason deferred |
|
||
|--------|----------|-------------|-----------------|
|
||
| BUG-NNNN | S[1-4] | [description] | [reason] |
|
||
|
||
---
|
||
|
||
## QA Sign-Off
|
||
|
||
**QA scope**: [Targeted smoke / Broader regression]
|
||
**Verdict**: [PASS / PASS WITH WARNINGS / NOT ASSESSED]
|
||
**QA lead**: qa-lead agent
|
||
**Date**: [date]
|
||
**Warnings (if any)**: [list or "None"]
|
||
**Not assessed (if any)**: [what could not be checked, and why — or "None"]
|
||
|
||
---
|
||
|
||
## Rollback Plan
|
||
|
||
See: `production/releases/rollback-plan-[version].md`
|
||
|
||
**Trigger condition**: If [N] or more S1 bugs are reported within [X] hours of launch, execute rollback.
|
||
**Rollback owner**: [user / producer]
|
||
|
||
---
|
||
|
||
## Approvals Required Before Deploy
|
||
|
||
- [ ] lead-programmer: all fixes reviewed
|
||
- [ ] qa-lead: QA gate PASS confirmed
|
||
- [ ] producer: deployment timing approved
|
||
- [ ] release-manager: platform submission confirmed
|
||
|
||
---
|
||
|
||
## Player-Facing Patch Notes
|
||
|
||
[Draft for community-manager to review before publishing]
|
||
|
||
[list player-facing changes in plain language]
|
||
```
|
||
|
||
Ask: "May I write this patch record to `production/releases/day-one-patch-[version].md`?"
|
||
|
||
---
|
||
|
||
## Phase 7: Next Steps
|
||
|
||
After the patch record is written:
|
||
|
||
1. Run `/patch-notes` to generate the player-facing version of the patch notes
|
||
2. Run `/bug-report verify [BUG-ID]` for each fixed bug after the patch is live
|
||
3. Run `/bug-report close [BUG-ID]` for each verified fix
|
||
4. Schedule a post-launch review 48–72 hours after launch using `/retrospective [milestone-name]` for the launch milestone in `production/milestones/`
|
||
|
||
**If any S1 bugs remain open after the patch:**
|
||
> "⚠️ S1 bugs remain open and were not patched. These are accepted risks. Document them in the rollback plan trigger conditions — if they occur at scale, rollback may be preferable to a follow-up patch."
|
||
|
||
Use `AskUserQuestion`:
|
||
- Prompt: "Day-one patch complete. What's next?"
|
||
- Options:
|
||
- `[A] Run /patch-notes — generate player-facing patch notes`
|
||
- `[B] Run /bug-report to log any issues found post-deploy`
|
||
- `[C] Stop here`
|
||
|
||
---
|
||
|
||
## Collaborative Protocol
|
||
|
||
- **Scope discipline is everything** — resist scope creep; every addition increases risk
|
||
- **Rollback plan first, always** — a patch without a rollback plan is irresponsible
|
||
- **Deferred is not forgotten** — every deferred bug is listed in the record's
|
||
"Deferred to 1.1" table; run `/bug-triage` afterwards to schedule them into the 1.1 sprint
|
||
(if the project has no sprint plan, as on the default minimal workflow, into the brief's build order)
|
||
- **Player communication is part of the patch** — `/patch-notes` is a required output, not optional
|