Fix release for 1.1.2: the 14 longest skills keep their later phases after a compaction, a question nobody answered is never taken as an answer, settings read the same from a subfolder, the commit check works for a project in a subfolder of a larger repository, every skill opens with a title, and the shipped allow rules no longer approve deleting a branch or writing files without asking. Details in CHANGELOG.md; upgrade steps in UPGRADING.md (v1.1.2 → v1.1.3). Refs #83 Refs #133 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_0185en4t76fPn7315q4c3nko
164 lines
6.5 KiB
Markdown
164 lines
6.5 KiB
Markdown
---
|
||
name: scope-check
|
||
description: "Scope creep check — current scope versus the original plan. Flags additions, quantifies bloat, recommends cuts. 'Any scope creep?'"
|
||
argument-hint: "[feature-name or sprint-N]"
|
||
user-invocable: true
|
||
allowed-tools: Read, Glob, Grep, Bash(git log *)
|
||
model: haiku
|
||
---
|
||
|
||
# Scope Check
|
||
|
||
This skill is read-only — it reports findings but writes no files.
|
||
|
||
Compares original planned scope against current state to detect, quantify, and triage
|
||
scope creep.
|
||
|
||
**Argument:** `$ARGUMENTS` — the whole string: a feature name (it may be several words), sprint number, or milestone name.
|
||
|
||
---
|
||
|
||
## Phase 1: Find the Original Plan
|
||
|
||
Locate the baseline scope document for the given argument:
|
||
|
||
- **Feature name** → read `design/gdd/[feature].md` or matching file in `design/`
|
||
- **Sprint number** (e.g., `sprint-3`) → read `production/sprints/sprint-003.md` (the name `/sprint-plan` writes) or similar
|
||
- **Milestone** → read `production/milestones/[name].md`
|
||
|
||
If the document is not found, report the missing file and stop. Do not proceed without
|
||
a baseline to compare against.
|
||
|
||
---
|
||
|
||
## Phase 2: Read the Current State
|
||
|
||
Check what has actually been implemented or is in progress:
|
||
|
||
- Scan the codebase for files related to the feature/sprint
|
||
- Read git log for commits related to this work (`git log --oneline --since=[start-date]`)
|
||
- Check for TODO/FIXME comments that indicate unfinished scope additions
|
||
- Check active sprint plan if the feature is mid-sprint
|
||
|
||
---
|
||
|
||
## Phase 3: Compare Original vs Current Scope
|
||
|
||
Produce the comparison report:
|
||
|
||
```markdown
|
||
## Scope Check: [Feature/Sprint Name]
|
||
Generated: [Date]
|
||
|
||
### Original Scope
|
||
[List of items from the original plan]
|
||
|
||
### Current Scope
|
||
[List of items currently implemented or in progress]
|
||
|
||
> **If Phase 4 will return NOT ASSESSED, do not render the numeric block below.**
|
||
> Replace the counts and the Bloat Score with
|
||
> `[Baseline | Current state] unusable — see verdict` (whichever side could not
|
||
> be read) and give the reason. A rendered
|
||
> `Original items: 0 / Net scope change: 0%` one section above a NOT ASSESSED
|
||
> verdict re-creates the exact "0% reads as on track" hazard Phase 4 exists to
|
||
> kill, one phase earlier — and readers trust a number over a caveat.
|
||
|
||
### Scope Additions (not in original plan)
|
||
| Addition | Source | When | Justified? | Effort |
|
||
|----------|--------|------|------------|--------|
|
||
| [item] | [commit/person] | [date] | [Yes/No/Unclear] | [S/M/L] |
|
||
|
||
### Scope Removals (in original but dropped)
|
||
| Removed Item | Reason | Impact |
|
||
|-------------|--------|--------|
|
||
| [item] | [why removed] | [what's affected] |
|
||
|
||
### Bloat Score
|
||
- Original items: [N]
|
||
- Current items: [N]
|
||
- Items added: [N] (+[X]%)
|
||
- Items removed: [N]
|
||
- Net scope change: [+/-N] ([X]%)
|
||
|
||
### Risk Assessment
|
||
- **Schedule Risk**: [Low/Medium/High] — [explanation]
|
||
- **Quality Risk**: [Low/Medium/High] — [explanation]
|
||
- **Integration Risk**: [Low/Medium/High] — [explanation]
|
||
|
||
### Recommendations
|
||
1. **Cut**: [Items that should be removed to stay on schedule]
|
||
2. **Defer**: [Items that can move to a future sprint/version]
|
||
3. **Keep**: [Additions that are genuinely necessary]
|
||
4. **Flag**: [Items that need a decision from producer/creative-director]
|
||
```
|
||
|
||
---
|
||
|
||
## Phase 4: Verdict
|
||
|
||
Assign a canonical verdict based on net scope change:
|
||
|
||
| Net Change | Verdict | Meaning |
|
||
|-----------|---------|---------|
|
||
| ≤10% | **PASS** | On Track — within acceptable variance |
|
||
| >10–25% | **CONCERNS** | Minor Creep — manageable with targeted cuts |
|
||
| >25–50% | **FAIL** | Significant Creep — must cut or formally extend timeline |
|
||
| >50% | **FAIL** | Out of Control — stop, re-plan, escalate to producer |
|
||
|
||
**Before applying that table, check that the percentage means something.** Emit
|
||
**NOT ASSESSED** instead — never a computed percentage — when any of:
|
||
|
||
- The **baseline document exists but enumerates no scope items** (all headings,
|
||
placeholders, or `[TO BE CONFIGURED]`). Phase 1 stops when the file is *absent*;
|
||
this is the case where it is present and empty, and it is the more dangerous
|
||
one, because zero items yields a 0% net change that renders as **PASS — On
|
||
Track**. Nothing was compared. Nothing was on track.
|
||
- The **current state cannot be determined** — no related source files, no commits
|
||
in the window, nothing in progress to read. Comparing a real baseline against an
|
||
unreadable present is not a 0% change, and not the −100% that zero current
|
||
items computes — the table reads both as PASS.
|
||
- The denominator would be zero for any other reason. A percentage computed from
|
||
no baseline items is not a small number; it is not a number.
|
||
|
||
`NOT ASSESSED` **outranks PASS** (a comparison that never happened has not shown
|
||
scope is on track) and **ranks below CONCERNS and FAIL** (measured creep is more
|
||
actionable than an unmeasurable baseline).
|
||
|
||
Output the verdict prominently:
|
||
|
||
```
|
||
**Scope Verdict: [PASS / CONCERNS / NOT ASSESSED / FAIL]**
|
||
Net change: [+X%] — [On Track / Minor Creep / Significant Creep / Out of Control]
|
||
[or: NOT ASSESSED — [which side could not be read, and why]]
|
||
```
|
||
|
||
---
|
||
|
||
## Phase 5: Next Steps
|
||
|
||
After presenting the report, offer concrete follow-up:
|
||
|
||
- **PASS** → no action required. Suggest re-running before next milestone.
|
||
- **NOT ASSESSED** → say which side was unreadable and what would fix it (populate
|
||
the baseline document, or point the skill at where the work actually lives).
|
||
Do not offer a re-run against the same inputs — it will produce the same
|
||
non-answer.
|
||
- **CONCERNS** → offer to identify the 2–3 additions with best cut ratio. Reference `/sprint-plan update` to formally re-scope (if the project has no sprint plan, as on the default minimal workflow, re-scope by editing the brief's build order).
|
||
- **FAIL** → recommend escalating to producer. Reference `/sprint-plan update` for re-planning (if the project has no sprint plan, as on the default minimal workflow, edit the brief's build order) or `/estimate` to re-baseline timeline.
|
||
|
||
End every verdict except NOT ASSESSED with:
|
||
> "Run `/scope-check [name]` again after cuts are made to verify the verdict improves."
|
||
|
||
(NOT ASSESSED ends with what would make it assessable, above — a re-run against
|
||
the same inputs would repeat the non-answer.)
|
||
|
||
---
|
||
|
||
### Rules
|
||
|
||
- Scope creep is additions without corresponding cuts or timeline extensions
|
||
- Not all additions are bad — some are discovered requirements. But they must be acknowledged and accounted for
|
||
- When recommending cuts, prioritize preserving the core player experience over nice-to-haves
|
||
- Always quantify scope changes — "it feels bigger" is not actionable, "+35% items" is
|